IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0701 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $19,610 $20,000 Implemented
CO0701 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,920 $3,750 Implemented
CO0701 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $2,460 Implemented
CO0701 # 01 Y:2015 01 2015 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $32,810 $82,650 Not Implemented
CO0637 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $900 Not Implemented
CO0637 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $1,560 $20,500 Not Implemented
CO0637 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $430 $450 Not Implemented
CO0637 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $460 Implemented
CO0637 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,650 $20,950 Implemented
CO0637 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,860 $24,000 Implemented
CO0637 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $3,450 $1,790 Not Implemented
CO0630 # 03 Y:2009 03 2009 USE OPTIMUM THICKNESS INSULATION $8,920 $12,000 Not Implemented
CO0630 # 05 Y:2009 05 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,830 $10,599 Not Implemented
CO0630 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,380 $46,700 Not Implemented
CO0630 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,410 $2,000 Not Implemented
CO0630 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,070 $9,010 Not Implemented
CO0580 # 06 Y:2006 06 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,460 $9,360 Not Implemented
CO0580 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $10,650 $500 Implemented
CO0580 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $9,880 $3,190 Not Implemented
CO0580 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $1,610 Not Implemented
CO0580 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,310 $980 Implemented
CO0580 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $3,750 $12,850 Implemented
CO0580 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $280 $500 Implemented
CO0580 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $50 $20 Implemented
CO0580 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $1,830 Implemented