Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0630 # 11 Y:2025 11 2025 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $11,572 $20,000 n/a
UF0630 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $958 $0 n/a
UF0630 # 03 Y:2025 03 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,224 $8,907 n/a
UF0630 # 02 Y:2025 02 2025 KEEP SOLID FUELS / RAW MATERIALS DRY $25,034 $48,000 n/a
UF0630 # 01 Y:2025 01 2025 UPGRADE CONTROLS ON COMPRESSORS $66,329 $8,820 n/a
UF0630 # 06 Y:2025 06 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,264 $14,760 n/a
UF0630 # 12 Y:2025 12 2025 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,323 $0 n/a
UF0630 # 08 Y:2025 08 2025 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,256 $2,120 n/a
UF0630 # 05 Y:2025 05 2025 IMPROVE COMBUSTION CONTROL CAPABILITY $10,115 $40,000 n/a
UF0630 # 10 Y:2025 10 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $625 $1,750 n/a
UF0630 # 04 Y:2025 04 2025 IMPROVE COMBUSTION CONTROL CAPABILITY $10,115 $2,000 n/a
UF0630 # 07 Y:2025 07 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,407 $25,400 n/a
UF0605 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $108,422 $322,608 Not Implemented
UF0605 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,825 $11,200 Implemented
UF0605 # 05 Y:2023 05 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,444,605 $0 Implemented
UF0605 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $5,654 $20,000 Implemented
UF0605 # 04 Y:2023 04 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $3,043 $2,800 Implemented
UF0605 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,052 $10,000 Implemented
UF0523 # 07 Y:2019 07 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,600 $9,464 Not Implemented
UF0523 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,621 $2,800 Not Implemented
UF0523 # 01 Y:2019 01 2019 REDUCE DELIVERY SCHEDULES $43,506 $0 Not Implemented
UF0523 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,925 $1,308 Implemented
UF0523 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,666 $30,000 Not Implemented
UF0523 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $14,533 $1,600 Implemented
UF0523 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,991 $4,959 Implemented