IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0160 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $169,964 $15,000 n/a
NV0160 # 07 Y:2000 07 2000 CHANGE PRODUCT SPECS $5,112 $0 n/a
NV0160 # 06 Y:2000 06 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,742 $125 n/a
NV0160 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $880 $585 n/a
NV0160 # 04 Y:2000 04 2000 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $4,907 $2,175 n/a
NV0160 # 01 Y:2000 01 2000 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $8,107 $370 n/a
NV0160 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,666 $240 n/a
NV0160 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,918 $8,274 n/a
ME0293 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,138 $10,890 Not Implemented
ME0293 # 06 Y:2000 06 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $30,516 $15,070 Not Implemented
ME0293 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $200 Implemented
ME0293 # 04 Y:2000 04 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,183 $0 Implemented
ME0293 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $4,661 $7,900 Not Implemented
ME0293 # 01 Y:2000 01 2000 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $19,379 $38,000 Not Implemented
SF0196 # 01 Y:2000 01 2000 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $648 $860 Implemented
SF0196 # 02 Y:2000 02 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $67 $287 Implemented
SF0196 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,663 $6,340 Implemented
SF0196 # 04 Y:2000 04 2000 COMBINE UTILITY METERS $1,738 $60 Implemented
SD0236 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,527 $8,000 Not Implemented
SD0236 # 02 Y:2000 02 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $271,210 $1,150,000 Implemented
SD0236 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,260 $17,300 Not Implemented
SD0236 # 04 Y:2000 04 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $862 $388 Implemented
SD0236 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $539 $0 Implemented
SD0236 # 06 Y:2000 06 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $29,288 $0 Not Implemented