Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 295 | Asphalt Paving And Roofing Materials |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0160 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $169,964 | $15,000 | n/a |
NV0160 # 07 Y:2000 | 07 | 2000 | CHANGE PRODUCT SPECS | $5,112 | $0 | n/a |
NV0160 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,742 | $125 | n/a |
NV0160 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $880 | $585 | n/a |
NV0160 # 04 Y:2000 | 04 | 2000 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,907 | $2,175 | n/a |
NV0160 # 01 Y:2000 | 01 | 2000 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $8,107 | $370 | n/a |
NV0160 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,666 | $240 | n/a |
NV0160 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,918 | $8,274 | n/a |
ME0293 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,138 | $10,890 | Not Implemented |
ME0293 # 06 Y:2000 | 06 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $30,516 | $15,070 | Not Implemented |
ME0293 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $200 | Implemented |
ME0293 # 04 Y:2000 | 04 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,183 | $0 | Implemented |
ME0293 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $4,661 | $7,900 | Not Implemented |
ME0293 # 01 Y:2000 | 01 | 2000 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $19,379 | $38,000 | Not Implemented |
SF0196 # 01 Y:2000 | 01 | 2000 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $648 | $860 | Implemented |
SF0196 # 02 Y:2000 | 02 | 2000 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $67 | $287 | Implemented |
SF0196 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,663 | $6,340 | Implemented |
SF0196 # 04 Y:2000 | 04 | 2000 | COMBINE UTILITY METERS | $1,738 | $60 | Implemented |
SD0236 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,527 | $8,000 | Not Implemented |
SD0236 # 02 Y:2000 | 02 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $271,210 | $1,150,000 | Implemented |
SD0236 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,260 | $17,300 | Not Implemented |
SD0236 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $862 | $388 | Implemented |
SD0236 # 05 Y:2000 | 05 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $539 | $0 | Implemented |
SD0236 # 06 Y:2000 | 06 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $29,288 | $0 | Not Implemented |