Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 295 | Asphalt Paving And Roofing Materials |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0249 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $329 | $1,104 | Not Implemented |
MI0249 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,904 | $80 | Implemented |
MI0249 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,546 | $1,660 | Implemented |
MI0249 # 06 Y:2013 | 06 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,451 | $347 | Implemented |
MI0249 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,223 | $2,520 | Implemented |
MI0249 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,076 | $13,090 | Not Implemented |
MI0249 # 03 Y:2013 | 03 | 2013 | INCREASE EFFICIENCY OF TRUCKS | $14,224 | $11,600 | Implemented |
MI0249 # 01 Y:2013 | 01 | 2013 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $1,845,922 | $2,000,000 | Implemented |
MI0249 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $38,483 | $20,790 | Not Implemented |
MI0247 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $118,483 | $20,790 | Not Implemented |
MI0247 # 08 Y:2013 | 08 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $870 | $347 | Implemented |
MI0247 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,108 | $80 | Not Implemented |
MI0247 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,908 | $2,520 | Implemented |
MI0247 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,525 | $1,660 | Implemented |
MI0247 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,027 | $8,010 | Implemented |
MI0247 # 03 Y:2013 | 03 | 2013 | INCREASE EFFICIENCY OF TRUCKS | $7,110 | $5,800 | Not Implemented |
MI0247 # 01 Y:2013 | 01 | 2013 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $630,378 | $1,000,000 | Not Implemented |
SF0433 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,866 | $32,002 | Not Implemented |
SF0433 # 06 Y:2013 | 06 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $9,806 | $46,860 | Implemented |
SF0433 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $7,030 | $21,402 | Implemented |
SF0433 # 01 Y:2013 | 01 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,312 | $393 | Implemented |
SF0433 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,790 | $3,152 | Implemented |
SF0433 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,785 | $9,062 | Not Implemented |
SF0433 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,718 | $11,431 | Not Implemented |
SU0335 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,297 | $5,686 | Not Implemented |