Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
411
matching recommendationsSIC | 2951 | Asphalt Paving Mixtures And Blocks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0216 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,605 | $175,000 | Not Implemented |
WV0216 # 03 Y:2001 | 03 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,413 | $1,000 | Implemented |
WV0216 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,970 | $4,460 | Not Implemented |
WV0216 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $15,557 | $1,500 | Implemented |
WV0216 # 06 Y:2001 | 06 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $99 | $80 | Implemented |
WV0216 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,354 | $75 | Implemented |
WV0216 # 08 Y:2001 | 08 | 2001 | BURN WASTE OIL FOR HEAT | $55,440 | $10,000 | Implemented |
WV0216 # 09 Y:2001 | 09 | 2001 | LEASE EQUIPMENT INSTEAD OF PURCHASING | $2,250 | $200 | Not Implemented |
WV0216 # 10 Y:2001 | 10 | 2001 | CLEAR AND RENT EXISTING SPACE | $6,000 | $500 | Not Implemented |
NV0160 # 01 Y:2000 | 01 | 2000 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $8,107 | $370 | n/a |
NV0160 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,666 | $240 | n/a |
NV0160 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,918 | $8,274 | n/a |
NV0160 # 04 Y:2000 | 04 | 2000 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,907 | $2,175 | n/a |
NV0160 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $880 | $585 | n/a |
NV0160 # 06 Y:2000 | 06 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,742 | $125 | n/a |
NV0160 # 07 Y:2000 | 07 | 2000 | CHANGE PRODUCT SPECS | $5,112 | $0 | n/a |
NV0160 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $169,964 | $15,000 | n/a |
ME0293 # 01 Y:2000 | 01 | 2000 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $19,379 | $38,000 | Not Implemented |
ME0293 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,138 | $10,890 | Not Implemented |
ME0293 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $4,661 | $7,900 | Not Implemented |
ME0293 # 04 Y:2000 | 04 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,183 | $0 | Implemented |
ME0293 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $200 | Implemented |
ME0293 # 06 Y:2000 | 06 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $30,516 | $15,070 | Not Implemented |
SD0236 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,527 | $8,000 | Not Implemented |
SD0236 # 02 Y:2000 | 02 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $271,210 | $1,150,000 | Implemented |