IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 2951 Asphalt Paving Mixtures And Blocks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0236 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,260 $17,300 Not Implemented
SD0236 # 04 Y:2000 04 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $862 $388 Implemented
SD0236 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $539 $0 Implemented
SD0236 # 06 Y:2000 06 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $29,288 $0 Not Implemented
NV0132 # 01 Y:1999 01 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $78,922 $210,000 Not Implemented
NV0132 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,392 $39,424 Implemented
NV0132 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,139 $1,760 Not Implemented
NV0132 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,402 $2,405 Not Implemented
NV0132 # 05 Y:1999 05 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,219 $1,590 Not Implemented
NV0132 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,012 $0 Implemented
NV0132 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $172,243 $54,000 Implemented
NV0131 # 01 Y:1999 01 1999 INSULATE BARE EQUIPMENT $105 $200 Not Implemented
NV0131 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $1,146 $1,933 Not Implemented
NV0131 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,277 $638 Implemented
NV0131 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $111 $80 Implemented
NV0131 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $327 $0 Implemented
NV0131 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $50 Implemented
NV0131 # 07 Y:1999 07 1999 INSTALL SYSTEM TO COLLECT SCRAP $24,024 $20,320 Not Implemented
CO0426 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,960 $5,700 Implemented
CO0426 # 02 Y:1998 02 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $7,390 $9,870 Implemented
CO0426 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,590 $25,000 Not Implemented
CO0426 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,420 $4,303 Implemented
CO0426 # 05 Y:1998 05 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,770 $500 Implemented
CO0426 # 06 Y:1998 06 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,380 $6,000 Not Implemented
CO0426 # 07 Y:1998 07 1998 BURN WASTE OIL FOR HEAT $1,620 $5,420 Implemented