Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
500
matching recommendationsSIC | 2952 | Asphalt Felts And Coatings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0871 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,890 | $3,600 | Implemented |
AM0871 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,678 | $1,280 | Implemented |
AM0871 # 04 Y:2023 | 04 | 2023 | USE SYNTHETIC LUBRICANT | $3,265 | $500 | Implemented |
AM0871 # 10 Y:2023 | 10 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $525 | $0 | Implemented |
AM0871 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,228 | $23,380 | Not Implemented |
AM0871 # 09 Y:2023 | 09 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $694 | $588 | Implemented |
AM0871 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,840 | $30 | Implemented |
AM0871 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $7,430 | $10,320 | Implemented |
AM0871 # 08 Y:2023 | 08 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,600 | $2,000 | Implemented |
AM0871 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,880 | $2,700 | Implemented |
MA0846 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,483 | $4,908 | Implemented |
MA0846 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,534 | $15,450 | Not Implemented |
MA0846 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $674 | $3,293 | Not Implemented |
MA0846 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $128,459 | $1,302,718 | Not Implemented |
MA0846 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,290 | $625 | Implemented |
MA0846 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $10,916 | $5,542 | Not Implemented |
MA0830 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,862 | $65,410 | Not Implemented |
MA0830 # 04 Y:2022 | 04 | 2022 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $9,470 | $2,500 | Not Implemented |
MA0830 # 02 Y:2022 | 02 | 2022 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $40,790 | $80,000 | Not Implemented |
MA0830 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,055 | $20,800 | Not Implemented |
MA0830 # 06 Y:2022 | 06 | 2022 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $4,017 | $2,500 | Not Implemented |
MA0830 # 01 Y:2022 | 01 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $118,337 | $192,000 | Not Implemented |
SD0604 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,064 | $0 | Implemented |
SD0604 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,750 | $1,200 | Implemented |
SD0604 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,892 | $6,300 | Not Implemented |