IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 2952 Asphalt Felts And Coatings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0774 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $180,556 $1,134,251 Not Implemented
AM0774 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $200,328 $100 Not Implemented
AM0774 # 08 Y:2019 08 2019 USE SYNTHETIC LUBRICANT $2,349 $1,600 Not Implemented
AM0774 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,577 $17,085 Not Implemented
AM0774 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,150 $36,000 Not Implemented
AM0774 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $41,452 $72,710 Not Implemented
AM0774 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $48,197 $757,373 Not Implemented
AM0774 # 03 Y:2019 03 2019 ISOLATE HOT OR COLD EQUIPMENT $133,950 $353,500 Not Implemented
UF0523 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $735 $0 Not Implemented
UF0523 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,990 $0 Not Implemented
UF0523 # 07 Y:2019 07 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,600 $9,464 Not Implemented
UF0523 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,925 $1,308 Implemented
UF0523 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,991 $4,959 Implemented
UF0523 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $14,533 $1,600 Implemented
UF0523 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,666 $30,000 Not Implemented
UF0523 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,621 $2,800 Not Implemented
UF0523 # 01 Y:2019 01 2019 REDUCE DELIVERY SCHEDULES $43,506 $0 Not Implemented
OK1002 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $191,600 $806,420 Not Implemented
OK1002 # 06 Y:2019 06 2019 INSTALL SET-BACK TIMERS $1,083 $802 Implemented
OK1002 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $39,703 $37,000 Not Implemented
OK1002 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,768 $3,646 Implemented
OK1002 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,400 $2,933 Implemented
OK1002 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,343 $2,609 Implemented
OK1002 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $20,293 $28,306 Not Implemented
OK1001 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,655 $15,329 Not Implemented