IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 299 Misc. Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0339 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,917 $2,600 Not Implemented
UM0339 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $108,562 $15,000 Not Implemented
UM0339 # 01 Y:2008 01 2008 USE OPTIMUM TEMPERATURE $136,461 $172,800 Not Implemented
UM0339 # 03 Y:2008 03 2008 BURN WASTE OIL FOR HEAT $42,258 $4,000 Not Implemented
UM0339 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,086 $2,540 Not Implemented
UM0339 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $3,808 $682 Not Implemented
UM0339 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,808 $4,620 Not Implemented
UM0322 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $600 Implemented
UM0322 # 07 Y:2007 07 2007 REDUCE FLUID FLOW RATES $1,434 $2,200 Not Implemented
UM0322 # 06 Y:2007 06 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,752 $3,415 Not Implemented
UM0322 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,439 $1,000 Implemented
UM0322 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $6,308 $6,013 Implemented
UM0322 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,446 $890 Not Implemented
UM0322 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $14,251 $5,900 Implemented
UM0322 # 01 Y:2007 01 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,338 $0 Implemented
UM0322 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $560 $1,815 Not Implemented
UM0322 # 10 Y:2007 10 2007 USE PHOTOCELL CONTROLS $549 $190 Implemented
UM0237 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,000 $2,498 Not Implemented
UM0237 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,937 $1,650 Implemented
UM0237 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,146 $2,100 Not Implemented
UM0237 # 02 Y:2003 02 2003 ISOLATE HOT OR COLD EQUIPMENT $11,459 $10,000 Implemented
UM0237 # 01 Y:2003 01 2003 $116,280 $1,500 Not Implemented
UM0124 # 07 Y:1998 07 1998 $158,133 $30,000 Implemented
UM0124 # 06 Y:1998 06 1998 ELIMINATE/REDUCE AN OPERATION $22,516 $9,600 Implemented
UM0124 # 05 Y:1998 05 1998 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $17,113 $4,120 Not Implemented