IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,952

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0667 # 13 Y:2024 13 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $1,484 Implemented
WV0667 # 01 Y:2024 01 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,417 $2,917 Implemented
WV0667 # 11 Y:2024 11 2024 DEVELOP A REPAIR/REPLACE POLICY $1,520 $7,198 Implemented
WV0667 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,123 $7,270 Implemented
WV0667 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,599 $13,481 Implemented
WV0667 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $874 $1,127 Implemented
WV0667 # 14 Y:2024 14 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $328 $1,530 Implemented
WV0667 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $2,181 $2,720 Implemented
WV0667 # 10 Y:2024 10 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,648 $8,028 Implemented
WV0667 # 08 Y:2024 08 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,409 $5,810 Implemented
LE0582 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $5,494 Implemented
LE0582 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,259 $2,600 Implemented
LE0582 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $612 $0 Implemented
LE0582 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $2,331 $1,140 Implemented
LE0582 # 03 Y:2024 03 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,934 $5,000 Implemented
NL0097 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $10,810 Implemented
NL0097 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,785 $3,750 Implemented
NL0097 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,684 $3,900 Implemented
NL0097 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,556 $1,315 Implemented
NL0097 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $422 Implemented
NL0097 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,203 $120 Implemented
NL0097 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,054 $2,080 Implemented
IP0197 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,370 $13,000 Implemented
IP0197 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $33,478 $697 Implemented
IP0197 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,000 $1,506 Implemented