Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,804
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0276 # 11 Y:2000 | 11 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $44,269 | $150,000 | Implemented |
WV0189 # 01 Y:2000 | 01 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $876 | $1,936 | Implemented |
WV0189 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $498 | $325 | Implemented |
WV0189 # 06 Y:2000 | 06 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $675 | $275 | Implemented |
WV0189 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,653 | $10,800 | Implemented |
WV0189 # 09 Y:2000 | 09 | 2000 | INSTALL SKYLIGHTS | $2,123 | $2,436 | Implemented |
WV0189 # 12 Y:2000 | 12 | 2000 | INSTALL BACK-UP EQUIPMENT | $13,104 | $375 | Implemented |
GT0685 # 01 Y:2000 | 01 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,280 | $0 | Implemented |
GT0685 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $13,650 | $11,650 | Implemented |
GT0685 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $714 | $500 | Implemented |
GT0685 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $28,840 | $7,000 | Implemented |
GT0685 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,955 | $0 | Implemented |
TN0676 # 03 Y:2000 | 03 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $6,275 | $18,200 | Implemented |
TN0676 # 05 Y:2000 | 05 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $4,496 | $12,200 | Implemented |
TN0676 # 06 Y:2000 | 06 | 2000 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $3,095 | $6,250 | Implemented |
TN0676 # 07 Y:2000 | 07 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,025 | $175 | Implemented |
SD0240 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $114,651 | $214,102 | Implemented |
SD0240 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,067 | $2,600 | Implemented |
SD0240 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $193 | $714 | Implemented |
SD0240 # 05 Y:2000 | 05 | 2000 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $6,552 | $6,000 | Implemented |
AS0272 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $160 | $145 | Implemented |
AS0272 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,392 | $14,863 | Implemented |
AS0272 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $502 | $781 | Implemented |
AS0272 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $299 | $440 | Implemented |
AS0272 # 07 Y:2000 | 07 | 2000 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,419 | $295 | Implemented |