Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,818
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0228 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $538 | $15 | Implemented |
HO0228 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $200 | Implemented |
HO0228 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,810 | $778 | Implemented |
HO0228 # 07 Y:2000 | 07 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $9,360 | $5,000 | Implemented |
HO0228 # 09 Y:2000 | 09 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,880 | $2,340 | Implemented |
HO0228 # 10 Y:2000 | 10 | 2000 | PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING | $10,395 | $3,000 | Implemented |
HO0228 # 11 Y:2000 | 11 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $68,250 | $300,000 | Implemented |
HO0228 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,440 | $1,500 | Implemented |
HO0228 # 14 Y:2000 | 14 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $39,000 | $6,000 | Implemented |
HO0228 # 17 Y:2000 | 17 | 2000 | REDUCE OR ELIMINATE WASTE | $8,250 | $0 | Implemented |
AS0276 # 03 Y:2000 | 03 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $474 | $525 | Implemented |
AS0276 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,403 | $140 | Implemented |
AS0276 # 05 Y:2000 | 05 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $593 | $1,365 | Implemented |
AS0276 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,808 | $90 | Implemented |
AS0276 # 11 Y:2000 | 11 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $44,269 | $150,000 | Implemented |
WV0189 # 01 Y:2000 | 01 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $876 | $1,936 | Implemented |
WV0189 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $498 | $325 | Implemented |
WV0189 # 06 Y:2000 | 06 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $675 | $275 | Implemented |
WV0189 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,653 | $10,800 | Implemented |
WV0189 # 09 Y:2000 | 09 | 2000 | INSTALL SKYLIGHTS | $2,123 | $2,436 | Implemented |
WV0189 # 12 Y:2000 | 12 | 2000 | INSTALL BACK-UP EQUIPMENT | $13,104 | $375 | Implemented |
GT0685 # 01 Y:2000 | 01 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,280 | $0 | Implemented |
GT0685 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $13,650 | $11,650 | Implemented |
GT0685 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $714 | $500 | Implemented |
GT0685 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $28,840 | $7,000 | Implemented |