IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0201 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,996 $2,698 Implemented
UF0201 # 09 Y:1998 09 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,296 $1,000 Implemented
MA0409 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,000 $650 Implemented
MA0409 # 04 Y:1998 04 1998 PAY BILLS ON TIME TO AVOID LATE FEES $392 $0 Implemented
MA0409 # 05 Y:1998 05 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $-1,436 $815 Implemented
SD0199 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $750 Implemented
SD0199 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,572 $4,900 Implemented
SD0199 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,756 $1,182 Implemented
SD0199 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,118 $16,039 Implemented
SD0199 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,118 $8,500 Implemented
WI0320 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $740 Implemented
GT0635 # 01 Y:1998 01 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $34,200 $0 Implemented
GT0635 # 02 Y:1998 02 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $27,100 $900 Implemented
GT0635 # 03 Y:1998 03 1998 REPAIR AND ELIMINATE STEAM LEAKS $4,400 $800 Implemented
GT0635 # 05 Y:1998 05 1998 REPAIR OR REPLACE STEAM TRAPS $45,520 $40,100 Implemented
GT0635 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $940 $200 Implemented
AS0223 # 03 Y:1998 03 1998 DISCONNECT BALLASTS $163 $15 Implemented
AS0223 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $755 Implemented
AS0223 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,184 $540 Implemented
AS0223 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,500 $60 Implemented
AS0223 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $485,295 $705,960 Implemented
SD0196 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,292 $1,500 Implemented
SD0196 # 03 Y:1998 03 1998 USE OPTIMUM THICKNESS INSULATION $3,308 $1,151 Implemented
SD0196 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,255 $0 Implemented
SD0196 # 11 Y:1998 11 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,972 $7,130 Implemented