IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0286 # 12 Y:1997 12 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $200 $214 Implemented
MA0381 # 01 Y:1997 01 1997 INSTALL SYSTEM TO COLLECT SCRAP $62,985 $16,000 Implemented
MA0381 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,307 $65,000 Implemented
MA0381 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,560 $4,280 Implemented
MA0381 # 09 Y:1997 09 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $10,200 $0 Implemented
DS0075 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $2,348 $1,700 Implemented
DS0075 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,487 $21,753 Implemented
DS0075 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,576 $8,500 Implemented
DS0075 # 05 Y:1996 05 1996 INSTALL SET-BACK TIMERS $2,926 $150 Implemented
DS0075 # 06 Y:1996 06 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,520 $0 Implemented
AR0097 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,485 $120 Implemented
AR0097 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,496 $11,870 Implemented
AR0097 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $929 $0 Implemented
AR0097 # 06 Y:1996 06 1996 OPTIMIZE PLANT POWER FACTOR $5,388 $1,000 Implemented
AR0097 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,027 $4,900 Implemented
AR0097 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $1,489 $1,000 Implemented
CO0378 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,430 $15,373 Implemented
CO0378 # 02 Y:1996 02 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,590 $630 Implemented
CO0378 # 05 Y:1996 05 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $500 $0 Implemented
CO0378 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $160 Implemented
CO0378 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $150 Implemented
CO0378 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44 $58 Implemented
SF0105 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $856 $3,000 Implemented
SF0105 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $905 $1,082 Implemented
SF0105 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,020 $5,900 Implemented