Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,816
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0121 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,316 | $267 | Implemented |
RU0121 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,917 | $459 | Implemented |
RU0121 # 04 Y:1991 | 04 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $300 | $500 | Implemented |
RU0121 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,648 | $0 | Implemented |
RU0121 # 06 Y:1991 | 06 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $51,300 | $0 | Implemented |
RU0121 # 07 Y:1991 | 07 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,329 | $900 | Implemented |
UD0350 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $22,101 | $0 | Implemented |
UD0350 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,130 | $0 | Implemented |
MA0219 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $36,849 | $0 | Implemented |
MA0219 # 02 Y:1991 | 02 | 1991 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $30,005 | $7,000 | Implemented |
MA0219 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,604 | $446 | Implemented |
MA0219 # 04 Y:1991 | 04 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $6,693 | $100 | Implemented |
MA0219 # 05 Y:1991 | 05 | 1991 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $8,835 | $3,850 | Implemented |
MA0219 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $629 | $85 | Implemented |
UD0346 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $7,193 | $5,000 | Implemented |
UD0346 # 02 Y:1991 | 02 | 1991 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,995 | $0 | Implemented |
UD0346 # 03 Y:1991 | 03 | 1991 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,769 | $0 | Implemented |
UD0346 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,106 | $5,000 | Implemented |
UD0346 # 05 Y:1991 | 05 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,053 | $0 | Implemented |
OR0118 # 01 Y:1991 | 01 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,432 | $0 | Implemented |
OR0118 # 02 Y:1991 | 02 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,838 | $0 | Implemented |
OR0118 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $3,367 | $3,124 | Implemented |
OR0118 # 04 Y:1991 | 04 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $383 | $919 | Implemented |
OR0118 # 05 Y:1991 | 05 | 1991 | OPTIMIZE PLANT POWER FACTOR | $2,040 | $5,100 | Implemented |
OR0118 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $312 | $1,177 | Implemented |