Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,816
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0877 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,290 | $74,067 | Implemented |
AM0877 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,900 | $60,360 | Implemented |
AM0877 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,700 | $32,850 | Implemented |
AM0877 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,060 | $0 | Implemented |
UF0592 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $56,023 | $88,370 | Implemented |
UF0592 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,274 | $30,607 | Implemented |
UF0592 # 04 Y:2023 | 04 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,287 | $18,600 | Implemented |
UF0592 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $9,922 | $11,796 | Implemented |
UF0592 # 07 Y:2023 | 07 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,981 | $508 | Implemented |
UF0592 # 08 Y:2023 | 08 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,672 | $1,200 | Implemented |
UF0592 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,580 | $600 | Implemented |
UF0592 # 10 Y:2023 | 10 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $62,417 | $10,000 | Implemented |
TT0289 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,836 | $40 | Implemented |
TT0289 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,365 | $1,405 | Implemented |
TT0289 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,798 | $13,000 | Implemented |
TT0289 # 06 Y:2023 | 06 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $61,137 | $119,000 | Implemented |
WM0195 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,725 | $13,127 | Implemented |
WM0195 # 05 Y:2023 | 05 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,687 | $0 | Implemented |
WM0195 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,381 | $700 | Implemented |
WM0195 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $1,997 | $1,000 | Implemented |
WM0195 # 08 Y:2023 | 08 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,986 | $2,700 | Implemented |
MA0853 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,202 | $18,988 | Implemented |
MA0853 # 03 Y:2023 | 03 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,672 | $30,500 | Implemented |
MA0853 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,613 | $59,377 | Implemented |
MA0853 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,336 | $24,300 | Implemented |