Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0232 # 16 Y:2024 | 16 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $14,220 | $30,000 | Implemented |
DL0232 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $4,060 | $166 | Implemented |
DL0232 # 01 Y:2024 | 01 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,952 | $0 | Implemented |
DL0232 # 14 Y:2024 | 14 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,758 | $1,500 | Implemented |
DL0232 # 15 Y:2024 | 15 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $6,886 | $20,000 | Implemented |
DL0232 # 13 Y:2024 | 13 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,930 | $7,995 | Implemented |
DL0232 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,568 | $10,000 | Implemented |
DL0232 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $500 | $340 | Implemented |
DL0232 # 12 Y:2024 | 12 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,886 | $5,000 | Implemented |
DL0232 # 18 Y:2024 | 18 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $10,000 | Implemented |
DL0232 # 17 Y:2024 | 17 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,477 | $2,488 | Implemented |
DL0232 # 10 Y:2024 | 10 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $546 | $0 | Implemented |
DL0232 # 08 Y:2024 | 08 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,946 | $10,000 | Implemented |
DL0232 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,563 | $0 | Implemented |
DL0232 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $848 | $0 | Implemented |
DL0232 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,850 | $1,637 | Implemented |
DL0232 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $10,552 | $112 | Implemented |
DL0232 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $7,288 | $84 | Implemented |
DL0198 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,740 | $14,428 | Implemented |
DL0198 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,240 | $2,500 | Implemented |
DL0198 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,850 | $0 | Implemented |
DL0198 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,800 | $0 | Implemented |
DL0196 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $849 | $0 | Implemented |
DL0196 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $1,842 | $2,864 | Implemented |
DL0196 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,469 | $18,418 | Implemented |