IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0221 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,682 $4,200 Implemented
MZ0278 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $902,475 $6,762,500 Implemented
MZ0278 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $382,507 $601,250 Implemented
MZ0278 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $176,232 $3,250 Implemented
MZ0278 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $42,284 $13,051 Implemented
MZ0278 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $45,917 $2,907 Implemented
MZ0278 # 04 Y:2019 04 2019 REDUCE SCRAP PRODUCTION $126,263 $207,500 Implemented
MZ0278 # 10 Y:2019 10 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,709 $200 Implemented
MZ0278 # 09 Y:2019 09 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,558 $870 Implemented
SD0586 # 06 Y:2019 06 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,834 $2,795 Implemented
SD0586 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,882 $330 Implemented
SD0586 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,164 $24,783 Implemented
SD0586 # 07 Y:2019 07 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,750 $350 Implemented
SD0586 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,548 $17,875 Implemented
SD0586 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $57,437 $117,800 Implemented
SD0586 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,460 $0 Implemented
MA0805 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,514 $32,800 Implemented
MA0805 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,775 $200 Implemented
MA0805 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,405 $128,486 Implemented
TR0014 # 02 Y:2019 02 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,582 $0 Implemented
TR0014 # 01 Y:2019 01 2019 PAY UTILITY BILLS ON TIME $2,781 $0 Implemented
TR0014 # 03 Y:2019 03 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,971 $8,500 Implemented
TR0014 # 04 Y:2019 04 2019 METER WASTE WATER $719 $1,511 Implemented
TR0014 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,996 $8,838 Implemented
MA0806 # 04 Y:2019 04 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,289 $15,750 Implemented