Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
384
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0744 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $881 | $2,407 | n/a |
CO0744 # 06 Y:2022 | 06 | 2022 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $60,192 | $4,219 | n/a |
CO0744 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,731 | $3,276 | n/a |
CO0744 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,175 | $7,076 | n/a |
CO0744 # 05 Y:2022 | 05 | 2022 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $210,000 | $58,000 | n/a |
CO0744 # 04 Y:2022 | 04 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,847 | $9,768 | n/a |
CO0744 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,159 | $136,687 | n/a |
CO0720 # 04 Y:2016 | 04 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $5,510 | $27,600 | Not Implemented |
CO0720 # 01 Y:2016 | 01 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,640 | $62,670 | Not Implemented |
CO0720 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $300 | Implemented |
CO0720 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $930 | $1,330 | Not Implemented |
CO0720 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,190 | $67,155 | Implemented |
CO0712 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,140 | $22,400 | n/a |
CO0712 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,050 | $1,000 | n/a |
CO0712 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,180 | $7,940 | n/a |
CO0679 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $710 | $4,160 | Not Implemented |
CO0679 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,910 | $360 | Not Implemented |
CO0679 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,450 | $15,070 | Implemented |
CO0679 # 03 Y:2013 | 03 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $9,040 | $500 | Implemented |
CO0679 # 02 Y:2013 | 02 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $1,740 | $1,320 | Implemented |
CO0673 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $7,680 | $8,440 | Not Implemented |
CO0673 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,190 | $20,600 | Not Implemented |
CO0673 # 03 Y:2013 | 03 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,060 | $4,216 | Implemented |
CO0673 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,160 | $6,540 | Not Implemented |
CO0673 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,910 | $530 | Implemented |