IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0072 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $12,667 $11,960 Not Implemented
AS0072 # 09 Y:1992 09 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,161 $10,760 Not Implemented
AS0072 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $100 Not Implemented
AS0073 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,226 $5,173 Implemented
AS0073 # 02 Y:1992 02 1992 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,610 $9,350 Implemented
AS0073 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $245 $400 Implemented
AS0073 # 04 Y:1992 04 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,325 $0 Implemented
AS0073 # 05 Y:1992 05 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,124 $6,200 Implemented
AS0073 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $354 $1,072 Implemented
AS0073 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,554 $18,562 Implemented
AS0073 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,444 $13,440 Implemented
AS0073 # 09 Y:1992 09 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,072 $1,800 Implemented
AS0073 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,060 $400 Implemented
AS0073 # 11 Y:1992 11 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,056 $2,000 Implemented
AS0075 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,170 $300 Not Implemented
AS0075 # 02 Y:1992 02 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,051 $1,000 Not Implemented
AS0075 # 03 Y:1992 03 1992 IMPROVE LUBRICATION PRACTICES $845 $1,638 Not Implemented
AS0075 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,379 $9,635 Not Implemented
AS0075 # 05 Y:1992 05 1992 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,602 $1,008 Not Implemented
AS0075 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $1,860 $9,880 Not Implemented
AS0075 # 07 Y:1992 07 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,740 $9,000 Not Implemented
AS0075 # 08 Y:1992 08 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $840 $3,100 Not Implemented
AS0075 # 09 Y:1992 09 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,777 $0 Not Implemented
AS0075 # 10 Y:1992 10 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,506 $10,500 Not Implemented
AS0075 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,443 $469 Not Implemented