IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0924 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,134 $0 Not Implemented
UD0924 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $16,525 $6,100 Implemented
UD0924 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $67,200 Implemented
UD0924 # 11 Y:2015 11 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,383 $0 Not Implemented
UD0924 # 12 Y:2015 12 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,382 $0 Implemented
UD0924 # 13 Y:2015 13 2015 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $357,410 $0 Not Implemented
SD0497 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $118,874 $425,000 Not Implemented
SD0497 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,403 $14,111 Not Implemented
SD0497 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $15,039 $2,275 Not Implemented
SD0497 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,837 $1,500 Not Implemented
SD0497 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,591 $14,085 Not Implemented
SD0497 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,238 $10,050 Not Implemented
SD0497 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,323 $1,580 Not Implemented
SD0497 # 08 Y:2015 08 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,817 $12,575 Not Implemented
SD0497 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $953 $1,745 Not Implemented
SF0465 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,904 $0 Not Implemented
SF0465 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,344 $648 Implemented
SF0465 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,965 $3,081 Not Implemented
SF0465 # 04 Y:2015 04 2015 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $914 $1,510 Not Implemented
SF0465 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,736 $26,646 Implemented
UK1503 # 01 Y:2015 01 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $605 $960 Implemented
UK1503 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $3,487 $4,040 Implemented
UK1503 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $520 Implemented
UK1503 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $5,138 $3,760 Implemented
UK1503 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,831 $3,000 Implemented