IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

754

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0753 # 11 Y:2007 11 2007 USE OPTIMUM TEMPERATURE $998 $0 Implemented
UD0753 # 12 Y:2007 12 2007 OPTIMIZE PLANT POWER FACTOR $864 $9,000 Not Implemented
UD0753 # 13 Y:2007 13 2007 UPGRADE CONTROLS ON COMPRESSORS $299 $3,800 Not Implemented
UD0751 # 01 Y:2006 01 2006 REDUCE EXCESS STEAM BLEEDING $90,000 $18,000 Not Implemented
UD0751 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63,687 $0 Implemented
UD0751 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,112 $0 Not Implemented
UD0751 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $21,149 $61,500 Not Implemented
UD0751 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $13,248 $10,000 Not Implemented
UD0751 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,066 $28,800 Not Implemented
UD0751 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $0 Not Implemented
UD0751 # 08 Y:2006 08 2006 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $8,395 $2,000 Not Implemented
UD0751 # 09 Y:2006 09 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,062 $12,000 Not Implemented
UD0751 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $5,000 Implemented
UD0748 # 01 Y:2006 01 2006 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $432,000 $143,750 Not Implemented
UD0748 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $7,546 $0 Implemented
UD0748 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,200 $840 Implemented
UD0748 # 04 Y:2006 04 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,988 $2,960 Not Implemented
UD0748 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $303 $108 Implemented
UD0723 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,309 $0 Implemented
UD0723 # 09 Y:2005 09 2005 REDUCE WATER USE WITH COUNTER CURRENT RINSING $3,070 $2,000 Not Implemented
UD0723 # 10 Y:2005 10 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,730 $0 Not Implemented
UD0723 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $2,650 $2,629 Implemented
UD0723 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,164 $0 Implemented
UD0723 # 13 Y:2005 13 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,423 $500 Not Implemented
UD0723 # 14 Y:2005 14 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $840 $0 Not Implemented