IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

433

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0343 # 06 Y:1991 06 1991 INSTALL TURBULATORS $1,282 $3,157 Not Implemented
KU0343 # 07 Y:1991 07 1991 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,423 $6,200 Not Implemented
KU0343 # 08 Y:1991 08 1991 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,315 $0 Not Implemented
KU0343 # 09 Y:1991 09 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,545 $4,800 Not Implemented
KU0343 # 10 Y:1991 10 1991 ISOLATE HOT OR COLD EQUIPMENT $1,003 $2,180 Not Implemented
KU0343 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $542 $0 Not Implemented
KU0343 # 12 Y:1991 12 1991 INSTALL SET-BACK TIMERS $705 $110 Not Implemented
KU0343 # 13 Y:1991 13 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $447 $560 Not Implemented
KU0343 # 14 Y:1991 14 1991 INSTALL SET-BACK TIMERS $100 $110 Not Implemented
KU0306 # 01 Y:1990 01 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,917 $1,500 Not Implemented
KU0306 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,435 $200 Not Implemented
KU0306 # 03 Y:1990 03 1990 OPTIMIZE PLANT POWER FACTOR $20,507 $33,600 Not Implemented
KU0306 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $1,966 Not Implemented
KU0306 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $8,748 $0 Implemented
KU0306 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,643 $4,359 Implemented
KU0306 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,326 $0 Not Implemented
KU0306 # 08 Y:1990 08 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $229 $0 Not Implemented
OK0290 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $1,080 Implemented
OK0290 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,374 $1,890 Not Implemented
OK0290 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $334 Implemented
OK0290 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $575 $2,279 Not Implemented
OK0291 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $668 Implemented
OK0291 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,376 $18,000 Not Implemented
OK0291 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $973 $909 Implemented
OK0291 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $4,974 $0 Implemented