IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

542

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0228 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $455 $1,000 Not Implemented
HO0228 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $538 $15 Implemented
HO0228 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $200 Implemented
HO0228 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,810 $778 Implemented
HO0228 # 07 Y:2000 07 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $9,360 $5,000 Implemented
HO0228 # 08 Y:2000 08 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $9,360 $25,000 Not Implemented
HO0228 # 09 Y:2000 09 2000 IMPROVE SPACE COMFORT CONDITIONING $2,880 $2,340 Implemented
HO0228 # 10 Y:2000 10 2000 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $10,395 $3,000 Implemented
HO0228 # 11 Y:2000 11 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $68,250 $300,000 Implemented
HO0228 # 12 Y:2000 12 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,440 $1,500 Implemented
HO0228 # 13 Y:2000 13 2000 MOVE PRODUCT USING MECHANICAL MEANS $6,240 $2,500 Not Implemented
HO0228 # 14 Y:2000 14 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $39,000 $6,000 Implemented
HO0228 # 15 Y:2000 15 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,456 $6,500 Not Implemented
HO0228 # 16 Y:2000 16 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $780 $750 Not Implemented
HO0228 # 17 Y:2000 17 2000 REDUCE OR ELIMINATE WASTE $8,250 $0 Implemented
MA0454 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,113 $11,700 Not Implemented
MA0454 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,776 $16,250 Not Implemented
MA0454 # 03 Y:1999 03 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $667 $2,675 Not Implemented
MA0451 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,798 $50,000 Not Implemented
MA0451 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,519 $11,400 Not Implemented
MA0451 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,232 $7,614 Not Implemented
MA0451 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $3,400 Not Implemented
MA0451 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $680 $0 Implemented
MA0451 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $985 Not Implemented
MA0451 # 07 Y:1999 07 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $500 $2,675 Not Implemented