IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0024 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $1,050 Not Implemented
IP0024 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $281 $561 Not Implemented
WM0044 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $487 Implemented
WM0044 # 02 Y:2014 02 2014 USE PHOTOCELL CONTROLS $278 $1,020 Not Implemented
WM0044 # 03 Y:2014 03 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,297 $0 Implemented
WM0044 # 04 Y:2014 04 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,078 $5,000 Implemented
WM0044 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,359 $1,269 Implemented
WM0044 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $323 $345 Implemented
WM0044 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $763 $1,800 Not Implemented
WM0044 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $2,434 Implemented
UA0118 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $64,943 $3,600 Not Implemented
UA0118 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $57,584 $9,695 Implemented
UA0118 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,870 $100 Not Implemented
UA0118 # 04 Y:2014 04 2014 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $56,812 $0 Not Implemented
UA0118 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,871 $70,925 Implemented
UA0118 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $10,122 $8,800 Implemented
UA0118 # 07 Y:2014 07 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,430 $528 Not Implemented
IA0515 # 01 Y:2014 01 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $21,416 $3,325 Implemented
IA0515 # 02 Y:2014 02 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,176 $380 Implemented
IA0515 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,894 $14,469 Implemented
IA0515 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $848 $402 Not Implemented
IA0515 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,610 $392 Implemented
IA0515 # 06 Y:2014 06 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,119 $140,200 Not Implemented
UA0117 # 01 Y:2014 01 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $116,327 $120 Not Implemented
UA0117 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,244 $3,515 Not Implemented