IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0331 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,975 $8,500 Not Implemented
WI0331 # 05 Y:1998 05 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,218 $0 Not Implemented
WI0331 # 06 Y:1998 06 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,729 $0 Not Implemented
WI0331 # 07 Y:1998 07 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,249 $300 Implemented
WI0331 # 08 Y:1998 08 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $897 $608 Not Implemented
WI0320 # 01 Y:1998 01 1998 MOVE PRODUCT USING MECHANICAL MEANS $98,187 $100,000 Not Implemented
WI0320 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $4,771 $600 Not Implemented
WI0320 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,933 $6,400 Not Implemented
WI0320 # 04 Y:1998 04 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,532 $0 Not Implemented
WI0320 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $7,000 Not Implemented
WI0320 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $740 Implemented
WI0265 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,546 $60,000 Implemented
WI0265 # 02 Y:1996 02 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,889 $0 Not Implemented
WI0265 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,667 $8,000 Not Implemented
WI0265 # 04 Y:1996 04 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,626 $27,600 Not Implemented
WI0265 # 05 Y:1996 05 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,490 $6,500 Implemented
WI0265 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,039 $6,400 Implemented
WI0265 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $1,750 $6,000 Not Implemented
WI0265 # 08 Y:1996 08 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $954 $4,000 Not Implemented
WI0265 # 09 Y:1996 09 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $1,135 $0 Not Implemented
WI0265 # 10 Y:1996 10 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $718 $0 Not Implemented
WI0265 # 11 Y:1996 11 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $500 $2,000 Not Implemented
WI0171 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,629 $90,000 Not Implemented
WI0171 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,354 $1,769 Not Implemented
WI0171 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,095 $1,481 Not Implemented