Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16,964
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0258 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $160 | Implemented |
SU0258 # 08 Y:2007 | 08 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $213,621 | $114,259 | Not Implemented |
SU0258 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $491 | $469 | Implemented |
SU0258 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,446 | $4,400 | Implemented |
SU0258 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,915 | $2,847 | Not Implemented |
SU0258 # 12 Y:2007 | 12 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $197 | $344 | Not Implemented |
SU0258 # 13 Y:2007 | 13 | 2007 | INSTALL OCCUPANCY SENSORS | $112 | $357 | Implemented |
SU0258 # 14 Y:2007 | 14 | 2007 | OPTIMIZE PLANT POWER FACTOR | $1,080 | $9,965 | Not Implemented |
UM0324 # 01 Y:2007 | 01 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,396 | $2,140 | Not Implemented |
UM0324 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $5,954 | $543 | Not Implemented |
UM0324 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,631 | $4,000 | Not Implemented |
UM0324 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,978 | $0 | Implemented |
UM0324 # 05 Y:2007 | 05 | 2007 | OPTIMIZE PLANT POWER FACTOR | $7,222 | $6,917 | Implemented |
MI0156 # 01 Y:2007 | 01 | 2007 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $7,785 | $1,800 | Not Implemented |
MI0156 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,674 | $1,232 | Implemented |
MI0156 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,301 | $2,121 | Not Implemented |
MI0156 # 04 Y:2007 | 04 | 2007 | INSTALL SKYLIGHTS | $2,655 | $5,612 | Not Implemented |
MI0156 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,688 | $1,074 | Implemented |
MI0156 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,033 | $30 | Implemented |
MI0156 # 07 Y:2007 | 07 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $676 | $2,170 | Not Implemented |
UF0404 # 01 Y:2007 | 01 | 2007 | USE OPTIMUM THICKNESS INSULATION | $45,739 | $1,287 | Implemented |
UF0404 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $10,863 | $369 | Implemented |
UF0404 # 03 Y:2007 | 03 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $22,502 | $4,417 | Not Implemented |
UF0404 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,757 | $5,610 | Not Implemented |
UF0404 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $603 | $230 | Implemented |