Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0825 # 12 Y:2012 12 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,335 $0 Not Implemented
OK0825 # 11 Y:2012 11 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,292 $406,800 Not Implemented
OK0825 # 10 Y:2012 10 2012 INSTALL SET-BACK TIMERS $929 $937 Not Implemented
OK0825 # 09 Y:2012 09 2012 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $15,683 $15,683 Not Implemented
OK0825 # 08 Y:2012 08 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,755 $31,500 Not Implemented
OK0825 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $450 Not Implemented
OK0825 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $538 Implemented
OK0825 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,478 $1,500 Implemented
OK0825 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,699 $65,000 Not Implemented
OK0825 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $194 $3,150 Not Implemented
OK0825 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,541 $68,775 Implemented
OK0825 # 01 Y:2012 01 2012 REPLACE BOILER $228,516 $1,085,000 Not Implemented
TT0090 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $3,800 $7,225 Not Implemented
TT0090 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,085 $0 Not Implemented
TT0090 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $334 $0 Implemented
TT0090 # 03 Y:2012 03 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,275 $1,000 Implemented
TT0090 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,764 $2,000 Implemented
TT0090 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,008 $1,780 Implemented
TT0090 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,200 $35,000 Not Implemented
TT0090 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $134 $525 Implemented
TT0090 # 08 Y:2012 08 2012 DEVELOP A REPAIR/REPLACE POLICY $2,350 $2,400 Implemented
TT0090 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,004 $54,507 Not Implemented
LL0334 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38 $19 Not Implemented
LL0334 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $664 $646 Not Implemented
LL0334 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $603 $290 Not Implemented