IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

754

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0173 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $1,042 Not Implemented
IP0173 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,684 $61,320 Not Implemented
IP0173 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,365 $840 Not Implemented
IP0173 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,055 $0 Not Implemented
IP0173 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,485 $0 Not Implemented
IC0276 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,114 $7,997 Implemented
IC0276 # 10 Y:2023 10 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $155,920 $1,014,736 Not Implemented
IC0276 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $85,492 $1,202,972 Not Implemented
IC0276 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $992 $1,773 Not Implemented
IC0276 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $12,027 $90 Not Implemented
IC0276 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,020 $4,424 Not Implemented
IC0276 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $1,869 $2,547 Not Implemented
IC0276 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $6,347 $3,405 Implemented
IC0276 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $102,187 $5,165 Not Implemented
IC0276 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $83,404 $10,984 Implemented
IP0170 # 10 Y:2023 10 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $195 $600 Not Implemented
IP0170 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,123 $6,636 Not Implemented
IP0170 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $564 Not Implemented
IP0170 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $140 $33 Not Implemented
IP0170 # 06 Y:2023 06 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $590 $113 Not Implemented
IP0170 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,696 $4,266 Not Implemented
IP0170 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,289 $660 Not Implemented
IP0170 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,876 $495 Not Implemented
IP0170 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,771 $0 Not Implemented
IP0170 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,367 $0 Not Implemented