IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,583

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0289 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,045 $65,000 Not Implemented
SD0289 # 08 Y:2002 08 2002 RECOVER AND REUSE WASTE MATERIAL $13,200 $20,000 Not Implemented
SD0289 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,600 $1,500 Not Implemented
SD0289 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $40,040 $0 Not Implemented
SD0286 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,685 $320 Implemented
SD0286 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,802 $4,400 Not Implemented
SD0286 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,235 $1,000 Implemented
SD0286 # 04 Y:2002 04 2002 USE POWER DURING OFF-PEAK PERIODS $2,320 $0 Implemented
SD0286 # 05 Y:2002 05 2002 INSTALL SKYLIGHTS $6,985 $0 Not Implemented
SD0286 # 06 Y:2002 06 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,250 $0 Implemented
SD0286 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $2,292 $0 Implemented
SD0286 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $262,070 $1,200,000 Not Implemented
SD0286 # 09 Y:2002 09 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $540 $300 Implemented
SD0286 # 10 Y:2002 10 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $122,879 $200,000 Not Implemented
SD0286 # 11 Y:2002 11 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $9,000 $3,500 Implemented
SD0286 # 12 Y:2002 12 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $28,610 $35,000 Not Implemented
SD0286 # 13 Y:2002 13 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $20,964 $25,000 Not Implemented
SD0286 # 14 Y:2002 14 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $3,348 $7,000 Implemented
SD0286 # 15 Y:2002 15 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,380 $3,000 Implemented
SD0286 # 16 Y:2002 16 2002 CHANGE OPERATING CONDITIONS $2,333 $0 Implemented
LM0019 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $425 $418 Not Implemented
LM0019 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,586 $240 Not Implemented
LM0019 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $2,482 Not Implemented
LM0019 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,000 $3,000 Implemented