IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,765

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0756 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,516 $30,000 Not Implemented
UD0756 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $26,847 $15,750 Not Implemented
UD0756 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,180 $12,000 Implemented
UD0756 # 11 Y:2007 11 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $13,900 $15,000 Not Implemented
UD0756 # 12 Y:2007 12 2007 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,769 $0 Implemented
UD0756 # 13 Y:2007 13 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $4,680 Implemented
UD0756 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $150 Implemented
UM0310 # 01 Y:2006 01 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $31,460 $21,337 Not Implemented
UM0310 # 02 Y:2006 02 2006 INSTALL SOLID WASTE INCINERATOR FOR HEAT $30,322 $27,325 Not Implemented
UM0310 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,000 $14,850 Implemented
UM0310 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,978 $375 Implemented
UM0310 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,694 $2,000 Not Implemented
UM0310 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $5,996 Implemented
UM0310 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $225 Implemented
UD0740 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,164 $258,960 Not Implemented
UD0740 # 02 Y:2006 02 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $107,569 $256,000 Implemented
UD0740 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $56,879 $252,100 Implemented
UD0740 # 04 Y:2006 04 2006 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,101 $17,030 Not Implemented
UD0740 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $42,737 $0 Implemented
UD0740 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,847 $52,400 Not Implemented
UD0740 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,352 $2,280 Implemented
UD0740 # 08 Y:2006 08 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,428 $10,000 Not Implemented
UD0740 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $0 Implemented
UD0740 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,805 $1,500 Implemented
UD0740 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,326 $1,700 Implemented