IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,378

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0275 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,809 $382 Implemented
IA0275 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,219 $1,450 Not Implemented
IA0275 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $960 $147 Implemented
IA0275 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,724 $10,962 Not Implemented
IA0275 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,769 $700 Implemented
IA0275 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,919 $0 Implemented
IA0275 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,067 $0 Implemented
IA0275 # 08 Y:2001 08 2001 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $722 $496 Implemented
IA0275 # 09 Y:2001 09 2001 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $21 $100 Not Implemented
IA0275 # 10 Y:2001 10 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $57,330 $21,000 n/a
SF0221 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $185 $0 Implemented
SF0221 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,977 $480 Implemented
SF0221 # 03 Y:2001 03 2001 UPGRADE CONTROLS ON COMPRESSORS $2,046 $344 Implemented
SF0221 # 04 Y:2001 04 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,217 $495 Not Implemented
SF0221 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,099 $840 Not Implemented
SF0221 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,141 $7,697 Not Implemented
SF0221 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $2,262 Not Implemented
SF0221 # 08 Y:2001 08 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,259 $1,259 Implemented
SF0221 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,204 $139,820 Not Implemented
SF0221 # 10 Y:2001 10 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $584 $80 Implemented
GT0718 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,000 $0 n/a
GT0718 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,360 $0 n/a
GT0718 # 03 Y:2001 03 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $645 $0 n/a
GT0718 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $1,625 $7,000 n/a
GT0718 # 05 Y:2001 05 2001 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $35,705 $3,500 n/a