Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
198
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0543 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,953 | $12,400 | Not Implemented |
MA0543 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,571 | $12,104 | Implemented |
MA0543 # 07 Y:2003 | 07 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,408 | $527 | Implemented |
MA0540 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,726,195 | $11,884,320 | Not Implemented |
MA0540 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,349 | $28,595 | Not Implemented |
MA0540 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $32,261 | $17,920 | Not Implemented |
MA0540 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,447 | $7,000 | Not Implemented |
MA0540 # 05 Y:2003 | 05 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,042 | $6,200 | Not Implemented |
MA0540 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $295,995 | $436,450 | Not Implemented |
MA0540 # 07 Y:2003 | 07 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $5,220 | $650 | Not Implemented |
MA0540 # 08 Y:2003 | 08 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $3,581 | $5,497 | Not Implemented |
MA0540 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,968 | $15,662 | Implemented |
MA0527 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,223 | $224,940 | Not Implemented |
MA0527 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,470 | $16,940 | n/a |
MA0527 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,813 | $23,660 | Not Implemented |
MA0527 # 04 Y:2003 | 04 | 2003 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $3,067 | $150 | Not Implemented |
MA0527 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,224 | $2,070 | Not Implemented |
MA0527 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,543 | $0 | Not Implemented |
MA0527 # 07 Y:2003 | 07 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,300 | $0 | Not Implemented |
MA0527 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $869 | $0 | Not Implemented |
MA0527 # 09 Y:2003 | 09 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $477 | $500 | Not Implemented |
MA0527 # 10 Y:2003 | 10 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $137 | $0 | Not Implemented |
MA0526 # 01 Y:2003 | 01 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $29,601 | $51,300 | n/a |
MA0526 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,577 | $40,000 | Not Implemented |
MA0526 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $5,194 | $5,150 | n/a |