IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0112 # 03 Y:1998 03 1998 IMPROVE SPACE COMFORT CONDITIONING $16,667 $9,361 Not Implemented
NV0112 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $282 $736 Not Implemented
NV0112 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $544 $2,000 Not Implemented
NV0105 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,676 $50,495 Not Implemented
NV0105 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,700 $1,890 Not Implemented
NV0105 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,271 $21,600 Implemented
NV0105 # 03 Y:1998 03 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,061 $0 Implemented
NV0105 # 04 Y:1998 04 1998 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $1,030 $1,267 Implemented
NV0105 # 05 Y:1998 05 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,488 $1,080 Implemented
NV0105 # 06 Y:1998 06 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $322 $150 Not Implemented
NV0105 # 07 Y:1998 07 1998 USE PHOTOCELL CONTROLS $1,872 $490 Not Implemented
NV0105 # 09 Y:1998 09 1998 USE RADIANT HEATER FOR SPOT HEATING $2,679 $8,064 Implemented
NV0105 # 10 Y:1998 10 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $52,000 $14,200 Implemented
NV0105 # 11 Y:1998 11 1998 REDUCE SCRAP PRODUCTION $12,952 $75,000 Not Implemented
NV0105 # 12 Y:1998 12 1998 REDUCE SCRAP PRODUCTION $64,064 $375,750 Implemented
NV0101 # 06 Y:1998 06 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $51,111 $60,000 Not Implemented
NV0101 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $166 $200 Implemented
NV0101 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $87 $74 Implemented
NV0101 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $234 $50 Not Implemented
NV0101 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $337 $255 Not Implemented
NV0101 # 07 Y:1998 07 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $16,500 $66,275 Implemented
NV0101 # 04 Y:1998 04 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $341 $600 Implemented
NV0100 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $233 $326 Implemented
NV0100 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,558 $1,890 Not Implemented
NV0100 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $150 Implemented