IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

496

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0285 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,659 $129,000 Not Implemented
TT0285 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,051 $12,000 Not Implemented
TT0285 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,920 $13,000 Implemented
TT0285 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,364 $55,000 Not Implemented
TT0285 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,293 $3,600 Implemented
TT0285 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,020 $33,675 Not Implemented
TT0285 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,451 $1,225 Implemented
TT0285 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $616 $2,793 Implemented
TT0262 # 01 Y:2021 01 2021 USE SOLAR HEAT FOR HEAT $44,686 $476,000 Not Implemented
TT0262 # 02 Y:2021 02 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,441 $15,000 Not Implemented
TT0262 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,405 $1,640 Not Implemented
TT0262 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $4,646 $3,879 Implemented
TT0262 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,023 $2,762 Implemented
TT0256 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,092 $12,000 Not Implemented
TT0256 # 02 Y:2021 02 2021 METER WASTE WATER $10,722 $2,150 Not Implemented
TT0256 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,816 $5,000 Not Implemented
TT0256 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,560 $150 Not Implemented
TT0256 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,866 $29,886 Not Implemented
TT0256 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $825 $3,000 Not Implemented
TT0256 # 07 Y:2021 07 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,460 $250 Not Implemented
TT0256 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $40 Not Implemented
TT0256 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $2,540 $588 Not Implemented
TT0256 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,667 $2,040 Not Implemented
TT0235 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,019 $180,485 Not Implemented
TT0235 # 02 Y:2020 02 2020 APPLY FOR INVESTMENT INCENTIVES $51,142 $11,500 Not Implemented