IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16,976

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0165 # 10 Y:1999 10 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $11,628 $12,888 Not Implemented
WV0165 # 11 Y:1999 11 1999 $15,000 $3,000 Not Implemented
MA0438 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,011 $6,075 Not Implemented
MA0438 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,856 $4,925 Not Implemented
MA0438 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,055 $3,400 Not Implemented
IA0219 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,876 $1,788 Not Implemented
IA0219 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $195 Not Implemented
IA0219 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,239 $0 Not Implemented
IA0219 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,916 $25 Not Implemented
IA0219 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,383 $5,695 Not Implemented
IA0219 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,373 $246 Not Implemented
IA0219 # 07 Y:1999 07 1999 INSTALL OCCUPANCY SENSORS $237 $1,197 Not Implemented
IA0219 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $95,331 $50 Not Implemented
IA0219 # 09 Y:1999 09 1999 $254,475 $511,800 Not Implemented
IA0219 # 10 Y:1999 10 1999 $28,975 $132 Not Implemented
BD0133 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,753 $800 Not Implemented
BD0133 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,108 $0 Implemented
BD0133 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $876 $525 Implemented
BD0133 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $566 Implemented
BD0133 # 05 Y:1999 05 1999 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $291 $500 Not Implemented
BD0133 # 06 Y:1999 06 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $20,292 $1,500 Not Implemented
BD0133 # 07 Y:1999 07 1999 $15,600 $61,950 Implemented
SD0223 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,581 $7,800 Not Implemented
SD0223 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,521 $3,930 Implemented
SD0223 # 03 Y:1999 03 1999 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $73,012 $62,000 Not Implemented