Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,096
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0198 # 04 Y:2021 | 04 | 2021 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $16,090 | $1,500 | Not Implemented |
DL0198 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,240 | $2,500 | Implemented |
DL0198 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $2,034 | $5,600 | Not Implemented |
DL0198 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $29,500 | $0 | Not Implemented |
DL0198 # 08 Y:2021 | 08 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,320 | $7,000 | Not Implemented |
DL0198 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,740 | $14,428 | Implemented |
AM0837 # 01 Y:2022 | 01 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $38,354 | $95,530 | Not Implemented |
AM0837 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,092 | $1,225 | Implemented |
AM0837 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $955 | $75 | Implemented |
AM0837 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $197 | $0 | Implemented |
AM0837 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $93 | $158 | Not Implemented |
WV0615 # 01 Y:2021 | 01 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $8,661 | $16,998 | Not Implemented |
WV0615 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,040 | $233 | Implemented |
WV0615 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $4,561 | $13,105 | Not Implemented |
WV0615 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $3,209 | $13,902 | Not Implemented |
WV0615 # 05 Y:2021 | 05 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,781 | $2,300 | Implemented |
WV0615 # 06 Y:2021 | 06 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $2,598 | $5,175 | Implemented |
WV0615 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $944 | $70 | Implemented |
WV0615 # 08 Y:2021 | 08 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $913 | $688 | Implemented |
WV0615 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $755 | $3,140 | Not Implemented |
WV0615 # 10 Y:2021 | 10 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $307 | $1,000 | Implemented |
OK1061 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,581 | $11,349 | Not Implemented |
OK1061 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $995 | $0 | Not Implemented |
OK1061 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,272 | $10,969 | Not Implemented |
OK1061 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $916 | $3,000 | Not Implemented |