Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,617
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0108 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,904 | $1,209 | Not Implemented |
SF0108 # 03 Y:1997 | 03 | 1997 | INSULATE BARE EQUIPMENT | $795 | $789 | Not Implemented |
SF0108 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $1,048 | $462 | Not Implemented |
SD0163 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,513 | $12,290 | Implemented |
SD0163 # 02 Y:1997 | 02 | 1997 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,303 | $0 | Implemented |
SD0163 # 03 Y:1997 | 03 | 1997 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $27,336 | $4,000 | Implemented |
SD0163 # 04 Y:1997 | 04 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,545 | $38,000 | Implemented |
SD0163 # 05 Y:1997 | 05 | 1997 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,307 | $1,800 | Implemented |
SD0163 # 06 Y:1997 | 06 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,941 | $9,500 | Implemented |
SD0163 # 07 Y:1997 | 07 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,325 | $1,127 | Implemented |
SD0163 # 08 Y:1997 | 08 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,455 | $1,250 | Implemented |
SD0163 # 09 Y:1997 | 09 | 1997 | USE WATER-BASED ADHESIVES | $55,640 | $0 | Not Implemented |
SD0163 # 10 Y:1997 | 10 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $77,729 | $211,365 | Implemented |
SD0163 # 11 Y:1997 | 11 | 1997 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $53,750 | $53,750 | Implemented |
SF0107 # 08 Y:1997 | 08 | 1997 | INSULATE BARE EQUIPMENT | $766 | $2,301 | Implemented |
SF0107 # 09 Y:1997 | 09 | 1997 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $7,120 | $5,285 | Not Implemented |
SF0107 # 10 Y:1997 | 10 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $2,543 | $1,200 | Not Implemented |
SF0107 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $119 | $11,984 | Implemented |
SF0107 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,990 | $16,568 | Implemented |
SF0107 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $435 | $360 | Implemented |
SF0107 # 04 Y:1997 | 04 | 1997 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,601 | $7,400 | Implemented |
SF0107 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,713 | $0 | Implemented |
SF0107 # 06 Y:1997 | 06 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,365 | $3,180 | Not Implemented |
SF0107 # 07 Y:1997 | 07 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,395 | $0 | Implemented |
SF0105 # 01 Y:1996 | 01 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $856 | $3,000 | Implemented |