IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,388

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0277 # 10 Y:1996 10 1996 INSULATE BARE EQUIPMENT $860 $860 Not Implemented
AM0277 # 11 Y:1996 11 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $120 Implemented
ND0239 # 01 Y:1996 01 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $222 $300 Implemented
ND0239 # 02 Y:1996 02 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,166 $0 Not Implemented
ND0239 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $146 $200 Not Implemented
ND0239 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,041 $3,720 Implemented
ND0239 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $134 $280 Not Implemented
ND0239 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $75 $234 Not Implemented
ND0239 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $240 Not Implemented
ND0239 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,533 $500 Implemented
ND0239 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,510 $817 Not Implemented
ND0239 # 10 Y:1996 10 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,777 $188 Not Implemented
MA0370 # 01 Y:1996 01 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $321,166 $27,000 Not Implemented
MA0370 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,771 $146,000 Not Implemented
MA0370 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,513 $32,940 Not Implemented
MA0370 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,249 $90,000 Not Implemented
MA0370 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,599 $18,000 Not Implemented
UL0158 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $617 $2,882 Not Implemented
UL0158 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $494 $14,360 Not Implemented
UL0158 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $87 Not Implemented
UL0158 # 04 Y:1996 04 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,525 $3,500 Not Implemented
UL0158 # 05 Y:1996 05 1996 RECOVER AND REUSE WASTE MATERIAL $2,984 $0 Not Implemented
AS0176 # 01 Y:1996 01 1996 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,963 $450 n/a
AS0176 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,024 $8,681 n/a
AS0176 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $1,509 $750 n/a