IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0251 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $110 Not Implemented
AM0251 # 09 Y:1995 09 1995 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $3,310 $0 Implemented
ND0229 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,253 $1,120 Implemented
ND0229 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,160 $6,280 Implemented
ND0229 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,594 $300 Not Implemented
ND0229 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $567 $358 Implemented
ND0229 # 05 Y:1995 05 1995 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,900 $15,020 Implemented
NC0066 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,066 $260 Implemented
NC0066 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112 $330 Implemented
NC0066 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,120 Implemented
NC0066 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $330 Implemented
NC0066 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $188 $198 Not Implemented
NC0066 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,500 $0 Not Implemented
NC0066 # 07 Y:1995 07 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,368 $30,845 Not Implemented
NC0066 # 08 Y:1995 08 1995 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,705 $1,806 Implemented
NC0066 # 09 Y:1995 09 1995 INSULATE BARE EQUIPMENT $1,888 $500 Not Implemented
UD0465 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,418 $300 Implemented
UD0465 # 02 Y:1995 02 1995 CONVERT TO ROBOTIC PAINTING $232,030 $200,000 Implemented
UD0465 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,058 $3,000 Implemented
UD0465 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,766 $3,255 Implemented
UD0465 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $519 $0 Implemented
WV0071 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,852 $600 Implemented
WV0071 # 02 Y:1995 02 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,374 $3,200 Implemented
WV0071 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $98 $187 Implemented
WV0071 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $4,513 $1,470 Not Implemented