IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,765

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0537 # 01 Y:1998 01 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,890 $0 Implemented
UD0537 # 02 Y:1998 02 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,148 $500 Not Implemented
UD0537 # 03 Y:1998 03 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,651 $0 Not Implemented
UD0537 # 04 Y:1998 04 1998 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $693 $600 Not Implemented
UD0537 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $0 Implemented
UD0537 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $2,820 Implemented
WV0129 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,294 $12,594 Implemented
WV0129 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,704 $205 Not Implemented
WV0129 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $1,750 $375 Implemented
WV0129 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $550 $500 Implemented
WV0129 # 05 Y:1997 05 1997 INSTALL AUTOMATIC STACK DAMPER $1,848 $250 Not Implemented
WV0129 # 06 Y:1997 06 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $240 $1,475 Not Implemented
WV0129 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $53 $44 Implemented
WV0129 # 08 Y:1997 08 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $60,000 $200 Not Implemented
WV0129 # 09 Y:1997 09 1997 RECOVER AND REUSE COOLING WATER $5,824 $2,300 Implemented
WV0129 # 10 Y:1997 10 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $420,000 $35,000 Not Implemented
UD0530 # 01 Y:1997 01 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,055 $2,200 Not Implemented
UD0530 # 02 Y:1997 02 1997 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,250 $5,600 Implemented
UD0530 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,540 $37,500 Not Implemented
UD0530 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,402 $0 Implemented
UD0530 # 05 Y:1997 05 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $51,015 $200,000 Not Implemented
UD0530 # 06 Y:1997 06 1997 RECOVER WASTE HEAT FROM EQUIPMENT $32,833 $66,000 Not Implemented
UD0525 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $40 n/a
UD0525 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $1,000 n/a
UD0525 # 03 Y:1997 03 1997 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $6,041 $0 n/a