IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0268 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,666 $30,813 Not Implemented
UD0397 # 01 Y:1993 01 1993 COMBINE UTILITY METERS $838 $200 Implemented
UD0397 # 02 Y:1993 02 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,462 $100 Implemented
UD0397 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $445 $20 Implemented
CO0270 # 01 Y:1993 01 1993 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,400 $250 Implemented
CO0270 # 02 Y:1993 02 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $14,790 $16,720 Not Implemented
CO0270 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,020 $2,500 Implemented
CO0270 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,450 $2,850 Implemented
CO0271 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,060 $400 Implemented
CO0271 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,640 $400 Implemented
CO0271 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,260 $2,500 Implemented
CO0271 # 04 Y:1993 04 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,240 $8,000 Not Implemented
CO0271 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,634 $37,430 Implemented
SD0048 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,294 $1,103 Implemented
SD0048 # 02 Y:1993 02 1993 UTILIZE A LESS EXPENSIVE COOLING METHOD $82,299 $143,700 Not Implemented
SD0048 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,491 $0 Not Implemented
SD0048 # 04 Y:1993 04 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $18,758 $17,100 Implemented
SD0048 # 05 Y:1993 05 1993 INSTALL SET-BACK TIMERS $4,596 $5,840 Implemented
SD0048 # 06 Y:1993 06 1993 INSTALL SET-BACK TIMERS $3,841 $1,600 Not Implemented
SD0048 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,778 $0 Implemented
MA0267 # 01 Y:1993 01 1993 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $5,832 $301 Implemented
MA0267 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,246 $4,899 Implemented
MA0267 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $2,483 $250 Implemented
MA0267 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,483 $0 Not Implemented
MA0267 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,235 $4,181 Not Implemented