Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
198
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0274 # 07 Y:1999 | 07 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $371 | $980 | n/a |
ME0274 # 08 Y:1999 | 08 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $100 | n/a |
ME0274 # 09 Y:1999 | 09 | 1999 | ELIMINATE/REDUCE AN OPERATION | $16,433 | $2,400 | n/a |
ME0274 # 10 Y:1999 | 10 | 1999 | MINIMIZE WATER USAGE | $1,674 | $868 | n/a |
ME0274 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $120 | $85 | n/a |
MA0430 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM TEMPERATURE | $5,357 | $300 | Implemented |
MA0430 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,264 | $0 | Not Implemented |
MA0430 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $711 | $1,840 | Implemented |
MA0430 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,777 | $10,080 | Not Implemented |
MA0430 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,070 | $27,413 | Not Implemented |
MA0430 # 06 Y:1998 | 06 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $56,116 | $21,247 | Not Implemented |
MA0430 # 07 Y:1998 | 07 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,518 | $800 | Implemented |
MA0430 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,048 | $75 | Implemented |
MA0430 # 09 Y:1998 | 09 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,863 | $15,850 | Not Implemented |
MA0429 # 01 Y:1998 | 01 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $14,812 | $19,107 | Not Implemented |
MA0429 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,695 | $5,302 | Implemented |
MA0429 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $268 | $0 | Implemented |
MA0429 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $412 | $60 | Implemented |
MA0429 # 05 Y:1998 | 05 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $269 | $66 | Not Implemented |
MA0429 # 06 Y:1998 | 06 | 1998 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $268 | $130 | Not Implemented |
MA0370 # 01 Y:1996 | 01 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $321,166 | $27,000 | Not Implemented |
MA0370 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,771 | $146,000 | Not Implemented |
MA0370 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,513 | $32,940 | Not Implemented |
MA0370 # 04 Y:1996 | 04 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,249 | $90,000 | Not Implemented |
MA0370 # 05 Y:1996 | 05 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,599 | $18,000 | Not Implemented |