IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0239 # 01 Y:2020 01 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $11,777 $0 Not Implemented
IC0239 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,780 $0 Not Implemented
IC0239 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,851 $5,000 Not Implemented
IC0239 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,411 $4,168 Not Implemented
IC0239 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $11,954 $26,400 Not Implemented
IC0239 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,041 $3,075 Not Implemented
LS2006 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $300 Implemented
LS2006 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,970 $1,800 Implemented
LS2006 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $0 Implemented
LS2006 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $566 $375 Implemented
LS2006 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $31 $45 Not Implemented
LS2006 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,553 $7,413 Not Implemented
LS2006 # 07 Y:2020 07 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,737 $81,000 Not Implemented
AS0485 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,923 $1,064 Implemented
AS0485 # 02 Y:2020 02 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $12,415 $1,195 Not Implemented
AS0485 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,573 $19,429 Implemented
AS0485 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $2,840 $1,830 Not Implemented
AS0485 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,501 $4,830 Implemented
AS0485 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $334 $130 Not Implemented
NL0048 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71,559 $111,731 Implemented
NL0048 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $24,509 $66,100 Not Implemented
NL0048 # 03 Y:2020 03 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $22,004 $20,500 Not Implemented
NL0048 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,955 $4,000 Implemented
NL0048 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,824 $50 Implemented
NL0048 # 06 Y:2020 06 2020 RECOVER AND REUSE WASTE MATERIAL $664 $3,180 Not Implemented