IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0008 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,322 $1,990 Not Implemented
MO0008 # 04 Y:1990 04 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,214 $1,844 Not Implemented
MO0008 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $735 $319 Implemented
MO0008 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $171 $0 Not Implemented
OR0090 # 01 Y:1990 01 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $64,713 $5,000 Implemented
OR0090 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $509 Implemented
OR0090 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $1,562 $3,277 Not Implemented
OR0090 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,098 $2,400 Not Implemented
OR0090 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $687 $1,950 Not Implemented
OR0090 # 06 Y:1990 06 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,669 $22,569 Not Implemented
MO0011 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $28,450 $7,438 Implemented
MO0011 # 02 Y:1990 02 1990 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,357 $464 Implemented
MO0011 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,328 $316 Implemented
MO0011 # 04 Y:1990 04 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,637 $2,693 Not Implemented
MO0011 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,481 $1,000 Implemented
MO0011 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,890 $1,226 Implemented
MO0011 # 07 Y:1990 07 1990 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,845 $26 Implemented
MO0011 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $666 $106 Not Implemented
WI0096 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $77,488 $400,000 Not Implemented
WI0096 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,714 $0 Not Implemented
WI0096 # 03 Y:1990 03 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,473 $3,895 Implemented
WI0096 # 04 Y:1990 04 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,068 $800 Implemented
WI0096 # 05 Y:1990 05 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $563 $0 Implemented
WI0096 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $560 $500 Implemented
WI0096 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $449 $1,744 Implemented