IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

667

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0195 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $887 $2,000 Not Implemented
MZ0195 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,672 $860 Implemented
BD0452 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,825 $4,565 Not Implemented
BD0452 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,841 $750 Not Implemented
BD0452 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $600 Implemented
BD0452 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $20 Not Implemented
BD0452 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,686 $1,310 Not Implemented
BD0452 # 06 Y:2014 06 2014 USE RADIANT HEATER FOR SPOT HEATING $909 $3,300 Not Implemented
BD0452 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $823 $300 Not Implemented
BD0452 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $435 Implemented
BD0452 # 09 Y:2014 09 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,911 $80 Not Implemented
MZ0135 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $106,262 $234,417 Not Implemented
MZ0135 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $89,370 $25,944 Implemented
MZ0135 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $27,410 $1,821 Implemented
MZ0135 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,968 $1,420 Not Implemented
MZ0135 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,434 $1,174 Implemented
MZ0135 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,201 $2,376 Not Implemented
MZ0135 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $722 $1,436 Not Implemented
MZ0135 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $688 $200 Implemented
MZ0135 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $552 $409 Not Implemented
MZ0133 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $109,110 $85,800 Implemented
MZ0133 # 02 Y:2013 02 2013 COMBINE UTILITY METERS $40,487 $25,000 Not Implemented
MZ0133 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $34,640 $92,500 Implemented
MZ0133 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $25,086 $2,277 Implemented
MZ0133 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,736 $26,800 Implemented