IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0261 # 04 Y:2019 04 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $107,654 $78,000 Implemented
MZ0261 # 05 Y:2019 05 2019 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $163 $0 Implemented
MZ0261 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,011 $14,440 Not Implemented
AS0462 # 01 Y:2019 01 2019 RECOVER MECHANICAL ENERGY $20,198 $17,100 Not Implemented
AS0462 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,497 $2,116 Not Implemented
AS0462 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,798 $450 Not Implemented
AS0462 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,105 $1,995 Not Implemented
AM0766 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $17,280 $17,230 Not Implemented
AM0766 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,320 $2,000 Not Implemented
AM0766 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $1,000 Not Implemented
AM0766 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $0 Not Implemented
AM0766 # 05 Y:2018 05 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,260 $0 Not Implemented
AM0766 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $3,460 Not Implemented
MA0795 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $100,737 $184,800 Not Implemented
MA0795 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,287 $200 Not Implemented
MA0795 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $6,779 $911 Not Implemented
MA0795 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $2,512 Implemented
LE0465 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,416 $1,000 Implemented
LE0465 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $19,292 Implemented
LE0465 # 03 Y:2018 03 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,594 $73,000 Not Implemented
LE0465 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,928 $260,000 Not Implemented
LE0465 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,973 $50,000 Not Implemented
MI0343 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $236,442 $800,000 Implemented
MI0343 # 02 Y:2018 02 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $37,140 $43,838 Not Implemented
MI0343 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,079 $2,030 Implemented