IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0290 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $500 n/a
UA0290 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $224 $224 n/a
UA0290 # 06 Y:2024 06 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $10,563 $56,271 n/a
UA0290 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $348 $452 n/a
UA0290 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $6,760 $8,397 n/a
UA0290 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,530 $5,091 n/a
UA0290 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,410 $555,652 n/a
UA0290 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,137 $2,005 n/a
UA0242 # 05 Y:2021 05 2021 USE RADIANT HEATER FOR SPOT HEATING $15,077 $22,703 Not Implemented
UA0242 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,142 $9,682 Implemented
UA0242 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,385 $59 Implemented
UA0242 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,957 $4,986 Implemented
UA0242 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $36,295 $6,449 Not Implemented
UA0232 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,270 $16,429 Not Implemented
UA0232 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,046 $50 Not Implemented
UA0232 # 06 Y:2020 06 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $105,703 $46,122 Not Implemented
UA0232 # 05 Y:2020 05 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,009 $3,457 Not Implemented
UA0232 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,011 $9,712 Not Implemented
UA0232 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,139 $205 Not Implemented
UA0191 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,326 $2,165 Implemented
UA0191 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,997 $0 Implemented
UA0191 # 01 Y:2018 01 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,889 $37,420 Not Implemented
UA0191 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,391 $150 Not Implemented
UA0191 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,060 $34,939 Not Implemented
UA0191 # 07 Y:2018 07 2018 RECOVER WASTE HEAT FROM EQUIPMENT $489 $2,112 Not Implemented