IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0215 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $131,800 $250,000 Not Implemented
DL0215 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $222,700 $184,000 Implemented
DL0215 # 01 Y:2023 01 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $29,690 $0 Not Implemented
DL0215 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,033 $38,000 Not Implemented
DL0215 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,640 $3,000 Implemented
DL0215 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $125,900 $30,000 Not Implemented
DL0215 # 07 Y:2023 07 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,998 $52,900 Not Implemented
DL0133 # 09 Y:2014 09 2014 REDUCE VENTILATION AIR $1,110 $0 Not Implemented
DL0133 # 08 Y:2014 08 2014 RECOVER AND REUSE COOLING WATER $5,180 $15,600 Not Implemented
DL0133 # 07 Y:2014 07 2014 INSTALL AUTOMATIC STACK DAMPER $3,680 $550 Not Implemented
DL0133 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,710 $26,460 Not Implemented
DL0133 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,170 $4,000 Not Implemented
DL0133 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $7,800 $6,000 Not Implemented
DL0133 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,385 $0 Not Implemented
DL0133 # 02 Y:2014 02 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,540 $18,000 Not Implemented
DL0133 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $63,690 $134,000 Not Implemented
DL0133 # 10 Y:2014 10 2014 REDUCE VENTILATION AIR $182 $235 Not Implemented
WV0459 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $35,104 $17,900 Not Implemented
WV0459 # 13 Y:2012 13 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $768 $1,188 Not Implemented
WV0459 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,895 $0 Implemented
WV0459 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,273 $90 Implemented
WV0459 # 06 Y:2012 06 2012 DEVELOP A REPAIR/REPLACE POLICY $10,718 $2,889 Implemented
WV0459 # 05 Y:2012 05 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,943 $1,000 Implemented
WV0459 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $12,749 $12,121 Not Implemented
WV0459 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $15,798 $23,822 Not Implemented