IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0409 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,770 $0 n/a
MS0409 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44,271 $0 n/a
MS0409 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $96 $582 n/a
UA0112 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,143 $520 Not Implemented
UA0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,965 $49,792 Not Implemented
UA0112 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,177 $878 Implemented
UA0112 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,385 $2,330 Implemented
UA0112 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,737 $19,304 Not Implemented
UA0096 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,715 $39,573 Implemented
UA0096 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $817 $996 Implemented
UA0096 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $3,456 $1,320 Implemented
UA0096 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $8 Not Implemented
UA0096 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $400 Not Implemented
UA0096 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $1,000 Not Implemented
UA0096 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,079 $0 Implemented
UA0096 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,997 $545 Implemented
UA0085 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $151,364 $35,390 Implemented
UA0085 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $146,229 $68,100 Not Implemented
UA0085 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $58,443 $1,920 Implemented
UA0085 # 08 Y:2012 08 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $48,968 $131,587 Not Implemented
UA0085 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349,571 $177,363 Not Implemented
UA0085 # 10 Y:2012 10 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $529,960 $400,000 Not Implemented
UA0085 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,936 $7,682 Not Implemented
UA0085 # 03 Y:2012 03 2012 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $86,957 $214,808 Not Implemented
UA0085 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $164,656 $57,024 Implemented