IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0082 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $314 $881 n/a
NL0082 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $1,917 n/a
NL0082 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $2,500 n/a
NL0082 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,917 $6,850 n/a
NL0082 # 02 Y:2023 02 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $14,674 $80,927 n/a
NL0082 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $676,628 $1,200,000 n/a
IA0481 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,468 $1,000 Not Implemented
IA0481 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,668 $1,668 Implemented
IA0481 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,174 $460 Not Implemented
IA0481 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,452 $192 Not Implemented
IA0481 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,687 $825 Implemented
IA0481 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $599 $50 Implemented
IA0481 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,228 $574 Implemented
IA0481 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,498 $18,823 Not Implemented
IA0357 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $25 Not Implemented
IA0357 # 07 Y:2004 07 2004 $206,874 $145,850 Implemented
IA0357 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $1,879 $2,445 Implemented
IA0357 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,225 $349 Implemented
IA0357 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $654 Implemented
IA0357 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $657 $262 Implemented
IA0357 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,027 $23 Implemented
DS0075 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,487 $21,753 Implemented
DS0075 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,576 $8,500 Implemented
DS0075 # 04 Y:1996 04 1996 USE A DIFFERENT OR RECYCLED RAW MATERIAL $21,114 $0 Not Implemented
DS0075 # 05 Y:1996 05 1996 INSTALL SET-BACK TIMERS $2,926 $150 Implemented